Request No. RQQ-2015-CMI-084
Description: ENGINEERING SERVICES FOR MILTON TRAIN STATION LAYOVER OF TRAINS 11 AND 12
Metrolinx is accepting bids (“Requests”) for the provision of engineering services for preliminary design; detailed design; preparation of construction tender documents; engineering services during construction, construction supervision; engineer of record and contract administration; testing and commissioning; post project closeout; and management of services, as more particularly described in this Request Document as required by Metrolinx, which Work relates to Milton GO Train Station Layover of Trains 11 and 12.
A Mandatory Site Meeting will be held at 10:00 a.m. on Monday June 13 , 2016, at Metrolinx’s location; Milton GO Station, 780 Main Street, Milton, Ontario.
Failure of Contractor to be present and registered from the time the meeting is called to order until the meeting is adjourned will result in disqualification from bidding.
Contractors must wear hard hats, safety boots, safety vests and have safety glasses with them at the site meeting(s). Failure to satisfy these requirements will result in exclusion from the site.
Metrolinx reserves the right to reject any or all Requests at its sole discretion.
Request to Qualify and Quote Documents are available online at www. metrolinx.merx.com.
Request enquiries and other communications are to be directed to Kim Stuart at (416) 202-5565, or e-mail kim.stuart@metrolinx.com.
Please note, effective Monday, February 10th, 2014 for any newly issued tenders Metrolinx will no longer be conducting Public Openings.
Only Consultants who possess the following experience and qualifications will be considered for award of this Contract:
- The necessary resources to sustain and complete the Services to the satisfaction of Metrolinx;
- Fifteen (15) years of experience in design, construction support and project management of Railway Passenger Train Storage facility;
- Fifteen (15) years demonstrated experience with construction projects undertaken on a Railway Passenger Train Storage facility which continues to operate during construction;
- Fifteen (15) years demonstrated experience with Design and construction of high voltage substations and wayside power systems; and
- Fifteen (15) years demonstrated experience with civil works including grading and storm water management.